Understand the issue
What this means for your floor
Flooring preparation may involve patching, grinding, panel replacement, fastening or leveling products. Conditions that indicate structural movement or another trade's scope should be referred to the appropriate qualified professional before a finish floor is installed.
What can change the recommendation?
High and low areasIdentify this item during the assessment and retain the relevant photos or product records. Make the assumption explicit in the written scope instead of treating it as automatically included.
Movement patternInspect and measure the condition before selecting a repair. Separate surface preparation from damaged material or structural movement and record the agreed limits of work.
Panel conditionInspect and measure the condition before selecting a repair. Separate surface preparation from damaged material or structural movement and record the agreed limits of work.
Moisture historyRecord the source, affected layers and relevant readings. Confirm that the condition is resolved and the next flooring step is permitted before covering the assembly.