Understand the issue
What this means for your floor
Final Floors scopes flooring-related subfloor work after the affected area is accessible and the cause of damage has been addressed.
What can change the recommendation?
Area of damageIdentify this item during the assessment and retain the relevant photos or product records. Make the assumption explicit in the written scope instead of treating it as automatically included.
Panel integrityInspect and measure the condition before selecting a repair. Separate surface preparation from damaged material or structural movement and record the agreed limits of work.
FasteningInspect and measure the condition before selecting a repair. Separate surface preparation from damaged material or structural movement and record the agreed limits of work.
Joist supportInspect and measure the condition before selecting a repair. Separate surface preparation from damaged material or structural movement and record the agreed limits of work.
Moisture historyRecord the source, affected layers and relevant readings. Confirm that the condition is resolved and the next flooring step is permitted before covering the assembly.